Plan the machines. Record the output. See the real cost.
Production Floor turns a sales order into a job card on a specific machine, issues material from the BOM, and records good output, rejection and scrap shift by shift. You see actual cost per unit, not a guess.
| Job card | Item | Machine | Target | Good | Status |
|---|---|---|---|---|---|
| JC-4410 | PP clip 12 mm | M-3 | 20,400 | 20,033 | Completed |
| JC-4411 | HDPE cap 28 mm | M-1 | 50,000 | 31,200 | Running |
| JC-4412 | ABS knob | M-5 | 8,000 | 0 | Planned |
| JC-4409 | PET jar 500 ml | M-2 | 12,000 | 11,540 | QC hold |
From the first entry to the last, in order.
Order assigned to a machine and date.
BOM quantity issued from stores.
Output and rejection per shift.
Final QC before finished goods store.
Material, machine and labour per unit.
Built for the way a small factory or trading desk actually works.
Bills of materials
Multi-level BOMs with alternates, scrap allowance and routing through operations and machines.
Machine planning
See load on each machine by day. Drag a job to a free slot and the promised date updates.
Job cards
Printed or on a tablet at the machine, with material issued, operator, shift and target quantity.
Output entry
Good quantity, rejection with reason, and downtime with cause, entered per shift in under a minute.
Scrap and regrind
Track scrap by type and reuse regrind where your quality rules allow it.
Job work
Send operations outside, track material at the vendor and receive finished goods with charges.
The parts that save the most time.
Plans that match the floor
- Machine and mould availability
- Changeover time between jobs
- Shift calendar and holidays
- Promised date updated when plans move
Shop floor entry that people use
- Big-button tablet screens at the machine
- Hindi and English labels
- Rejection reasons from a fixed list
- Downtime with cause and duration
Costs you can act on
- Actual vs standard material per job
- Rejection cost by item, machine and shift
- Machine hour rate and labour cost
- Job profitability against the sales price
Production Floor, answered.
We are not a process-heavy factory. Is this overkill?
Start with BOM and material issue only. Machine planning and shift entry can be switched on later.
Can operators enter output in Hindi?
Yes. Shop floor screens support Hindi and English, with large buttons for gloves and tablets.
Do you support make-to-stock?
Yes. Production can run against a sales order or against a stock replenishment plan.
Can we track moulds or dies?
Yes. Moulds and dies can be set as resources with shot counts and maintenance reminders.
Tomorrow's first order can run through one handle.
Data import help included. Your team keeps working while we set it up.